000 | 00816cam a2200229 i 4500 | ||
---|---|---|---|
999 |
_c382879 _d382879 |
||
003 | APU | ||
005 | 20191025052630.0 | ||
008 | 191003s2016 enka b 001 0 eng d | ||
020 | _a9781107548220 (pbk.) | ||
035 | _a(OCoLC)931596287 | ||
040 |
_aNLE _beng _cNLE _dWAN |
||
050 | 4 |
_aHD47.4 _b.J64 2016 |
|
100 | 1 |
_aJohansson, Per-Olov, _d1949- _944831 |
|
245 | 1 | 0 |
_aCost-benefit analysis for project appraisal / _cPer-Olov Johansson and Bengt Kriström. |
260 |
_aCambridge, U.K. : _bCambridge University Press _cc2016. |
||
300 |
_axiv, 235 pages : _billustrations ; _c25 cm. |
||
504 | _aIncludes bibliographical references (p. 215-229) and index. | ||
650 | 0 |
_aCost effectiveness. _944832 |
|
650 | 0 |
_aValue analysis (Cost control) _944833 |
|
700 | 1 |
_aKriström, Bengt. _944834 |
|
942 |
_2lcc _cBook |